Completed Project
A curated selection of EPC projects delivered across Oil & Gas, Renewables, and Industrial sectors. Each card links to a detailed case study with scope, KPIs, and deliverables.
🔧 EPC 🔗 Commissioning 🖥️ SCADA/DCS 📈 Performance KPIs
Filters
At a Glance
- 100% SAT pass on last 4 handovers
- Projects in 3 countries
- Avg. delivery 6–9 months
- USD 85M+ EPC delivered




WM32 Well Manifold – Mechanical Completion & 100-Well Connection – Pre-Commissioning, Commissioning and Strat-up
Bapco Upstream, Awali Oil Fields, Kingdom of Bahrain
Mechanical Completion (MEI) and punch-list closure for the WM32 Well Manifold with 100 wells connected, including full design documentation updates and redline mark-ups. Scope included system-wise PSSR execution and Redline Marked up (RLM) verification for: earthing system, high-power distribution, lighting and small-power networks, UPS and LVSG panels, control and automation systems, instrument air package, fuel gas system, header modules, separator packages, produced liquid system and associated pipeline tie-ins, RCS12 Pipeline #1, AG pipeline tie-in, chemical injection system, closed drain package, flare system, F&G system, safety shower & eye wash package, and fencing & access road infrastructure.
End User:
Bapco Upstream, Awali Oil Fields, Kingdom of Bahrain


ADNOC LNG TRAIN 1&2 REJUVENATION PROJECT-EPC DAS ISLAND (2023- 2025)
Das Island – Abu Dhabi – UAE
Verification, Validation, Engineering, Procurement, Construction & Commissioning
- Underground Cement Lined Piping (WP-1)
- Major and Medium Criticality Machinery – Pumps (WP-2)
- Replacing the Lube Oil Cooler of MP, HP Carbonate pumps and Lean DEA pumps
- Replacing mechanical governor for MP, HP and Lead DEA pumps
- Instrumentation (WP-7)
- Replacing existing CCC compressor controllers (Series 3) with CCC prodigy rack and card based system
- Replacement of ESD Valves (62 Nos)
- Replace Plant-43 fire water pump local control panels (02)
- Replace MRB critical components
- Replace CW Hydraulic discharge valve 68” (06)
- Replace the obsolete Plant-42 band/bar screen control system with new system
- Replace Control Valves CV pneumatic positioners with smart positioners
- Control System (WP-8 + TSR) Modification, Migration and Upgradation of DCS System (Honeywell), ESD, F&G System (Triconex)
- Electrical (WP-9) Modification, Replacement, and Retrofitting of Switchgear at Substations
- Total Sulphur Reduction (TSR)
- FAT, SAT, ISAT of the Packages
- All Electrical field related works
- Field Instruments, F&G Detectors, Control/Shutdown Valves, PSVs/TRVs and Analyzers of TSR scope
- Preparation of Constructability Review Workshop for: WP7, WP8, and WP79
Key Activities
- Project
- Engineering
- Procurement
End User:ADNOC – Abu Dhabi – UAE

EU3 HYDROGEN EXTRATION UNIT FOR BOROUGE 3 PROJECT EPC (2024-Jan- 2025)
ABU DHABI POLYMERS COMPANY LTD. (BOROUGE) / ADNOC
- PSA2 FG Compressors (1st, 2nd stage)
- PSA2 OG Compressors
- PSA2 unit Vessels
- C4 Guard Adsorber Cooler Dripleg
- C4 Guard Regen Gas Cooler
- Coalescer
- TA related material
- Process measurement monitoring
- FAT, SIT, SAT of the Packages
- Switchgear
- DCS/ESD System, F&G System
- All Electrical related works
- Field Instruments, F&G Detectors, Control/Shutdown Valves, PSVs/TRVs and Analyzers
Key Activities
- Project Engineering
- Procurement
End User: ADNOC
In Progress Project
A curated selection of EPC projects delivered across Oil & Gas, Renewables, and Industrial sectors. Each card links to a detailed case study with scope, KPIs, and deliverables.
🔧 EPC 🔗 Commissioning 🖥️ SCADA/DCS 📈 Performance KPIs
Filters
At a Glance
- 90% progress
- Projects in 3 countries
- Avg. delivery 6–9 months
- USD 85M+ EPC delivered




WM33 Well Manifold – Mechanical Completion & 100-Well Connection – Pre-Commissioning, Commissioning and Strat-up
Bapco Upstream, Awali Oil Fields, Kingdom of Bahrain
Mechanical Completion (MEI) and punch-list closure for the WM33 Well Manifold with 100 wells connected, including full design documentation updates and redline mark-ups. Scope included system-wise PSSR execution and Redline Marked up (RLM) verification for: earthing system, high-power distribution, lighting and small-power networks, UPS and LVSG panels, control and automation systems, instrument air package, fuel gas system, header modules, separator packages, produced liquid system and associated pipeline tie-ins, RCS12 Pipeline #1, AG pipeline tie-in, chemical injection system, closed drain package, flare system, F&G system, safety shower & eye wash package, and fencing & access road infrastructure.
End User:
Bapco Upstream – Kingdom of Bahrain




WM33 Well Manifold – Mechanical Completion & 100-Well Connection – Pre-Commissioning, Commissioning and Strat-up
Abu Safah Field, Bapco Upstream, Kingdom of Bahrain
Mechanical Completion (MEI) and punch-list closure for the WM32 Well Manifold with 100 wells connected, including full design documentation updates and redline mark-ups. Scope included system-wise PSSR execution and Redline Marked up (RLM) verification for: earthing system, high-power distribution, lighting and small-power networks, UPS and LVSG panels, control and automation systems, instrument air package, fuel gas system, header modules, separator packages, produced liquid system and associated pipeline tie-ins, RCS12 Pipeline #1, AG pipeline tie-in, chemical injection system, closed drain package, flare system, F&G system, safety shower & eye wash package, and fencing & access road infrastructure.
End User:
Bapco Upstream – Kingdom of Bahrain